[ 
https://issues.apache.org/jira/browse/HIVE-22068?page=com.atlassian.jira.plugin.system.issuetabpanels:all-tabpanel
 ]

Ashutosh Bapat updated HIVE-22068:
----------------------------------
    Attachment: HIVE-22068.07.patch
        Status: Patch Available  (was: In Progress)

Fixed ptest failures from the previous run.

> Return the last event id dumped as repl status to avoid notification event 
> missing error.
> -----------------------------------------------------------------------------------------
>
>                 Key: HIVE-22068
>                 URL: https://issues.apache.org/jira/browse/HIVE-22068
>             Project: Hive
>          Issue Type: Improvement
>            Reporter: Ashutosh Bapat
>            Assignee: Ashutosh Bapat
>            Priority: Major
>              Labels: pull-request-available
>         Attachments: HIVE-22068.01.patch, HIVE-22068.02.patch, 
> HIVE-22068.03.patch, HIVE-22068.04.patch, HIVE-22068.05.patch, 
> HIVE-22068.06.patch, HIVE-22068.07.patch
>
>          Time Spent: 2h 20m
>  Remaining Estimate: 0h
>
> In repl load, update the status of target database to the last event dumped 
> so that repl status returns that and next incremental can specify it as the 
> event from which to start the dump. WIthout that repl status might return and 
> old event which might cause, older events to be dumped again and/or a 
> notification event missing error if the older events are cleaned by the 
> cleaner.
> While at it
>  * Add more logging to DB notification listener cleaner thread
>  ** The time when it considered cleaning, the interval and time before which 
> events were cleared, the min and max id at that time
>  ** how many events were cleared
>  ** min and max id after the cleaning.
>  * In REPL::START document the starting event, end event if specified and the 
> maximum number of events, if specified.
>  *



--
This message was sent by Atlassian Jira
(v8.3.2#803003)

Reply via email to