[ https://issues.apache.org/jira/browse/HIVE-22241?page=com.atlassian.jira.plugin.system.issuetabpanels:comment-tabpanel&focusedCommentId=16937624#comment-16937624 ]
Hive QA commented on HIVE-22241: -------------------------------- Here are the results of testing the latest attachment: https://issues.apache.org/jira/secure/attachment/12981268/HIVE-22241.patch {color:green}SUCCESS:{color} +1 due to 2 test(s) being added or modified. {color:red}ERROR:{color} -1 due to 1 failed/errored test(s), 17010 tests executed *Failed tests:* {noformat} org.apache.hadoop.hive.cli.TestCliDriver.testCliDriver[show_functions] (batchId=81) {noformat} Test results: https://builds.apache.org/job/PreCommit-HIVE-Build/18717/testReport Console output: https://builds.apache.org/job/PreCommit-HIVE-Build/18717/console Test logs: http://104.198.109.242/logs/PreCommit-HIVE-Build-18717/ Messages: {noformat} Executing org.apache.hive.ptest.execution.TestCheckPhase Executing org.apache.hive.ptest.execution.PrepPhase Executing org.apache.hive.ptest.execution.YetusPhase Executing org.apache.hive.ptest.execution.ExecutionPhase Executing org.apache.hive.ptest.execution.ReportingPhase Tests exited with: TestsFailedException: 1 tests failed {noformat} This message is automatically generated. ATTACHMENT ID: 12981268 - PreCommit-HIVE-Build > Implement UDF to convert a date/timestamp from Gregorian-Julian hybrid > calendar to proleptic Gregorian calendar > --------------------------------------------------------------------------------------------------------------- > > Key: HIVE-22241 > URL: https://issues.apache.org/jira/browse/HIVE-22241 > Project: Hive > Issue Type: Improvement > Components: UDF > Reporter: Jesus Camacho Rodriguez > Assignee: Jesus Camacho Rodriguez > Priority: Major > Attachments: HIVE-22241.patch > > > UDF that converts a date/timestamp from *Gregorian-Julian hybrid* calendar, > i.e., calendar that supports both the Julian and Gregorian calendar systems > with the support of a single discontinuity, which corresponds by default to > the Gregorian date when the Gregorian calendar was instituted, to *proleptic > Gregorian calendar* (ISO 8601 standard), which is produced by extending the > Gregorian calendar backward to dates preceding its official introduction in > 1582. -- This message was sent by Atlassian Jira (v8.3.4#803005)