[ 
https://issues.apache.org/jira/browse/HIVE-22964?page=com.atlassian.jira.plugin.system.issuetabpanels:comment-tabpanel&focusedCommentId=17056293#comment-17056293
 ] 

Hive QA commented on HIVE-22964:
--------------------------------



Here are the results of testing the latest attachment:
https://issues.apache.org/jira/secure/attachment/12996260/HIVE-22964.1.patch

{color:red}ERROR:{color} -1 due to no test(s) being added or modified.

{color:green}SUCCESS:{color} +1 due to 18093 tests passed

Test results: 
https://builds.apache.org/job/PreCommit-HIVE-Build/21054/testReport
Console output: https://builds.apache.org/job/PreCommit-HIVE-Build/21054/console
Test logs: http://104.198.109.242/logs/PreCommit-HIVE-Build-21054/

Messages:
{noformat}
Executing org.apache.hive.ptest.execution.TestCheckPhase
Executing org.apache.hive.ptest.execution.PrepPhase
Executing org.apache.hive.ptest.execution.YetusPhase
Executing org.apache.hive.ptest.execution.ExecutionPhase
Executing org.apache.hive.ptest.execution.ReportingPhase
{noformat}

This message is automatically generated.

ATTACHMENT ID: 12996260 - PreCommit-HIVE-Build

> MM table split computation is very slow
> ---------------------------------------
>
>                 Key: HIVE-22964
>                 URL: https://issues.apache.org/jira/browse/HIVE-22964
>             Project: Hive
>          Issue Type: Improvement
>            Reporter: Aditya Shah
>            Assignee: Aditya Shah
>            Priority: Major
>         Attachments: HIVE-22964.1.patch, HIVE-22964.patch
>
>
> Since for MM table we process the paths prior to inputFormat.getSplits() we 
> end up doing listing on the whole table at once. This could be optimized.



--
This message was sent by Atlassian Jira
(v8.3.4#803005)

Reply via email to