[ https://issues.apache.org/jira/browse/HIVE-23247?page=com.atlassian.jira.plugin.system.issuetabpanels:comment-tabpanel&focusedCommentId=17088137#comment-17088137 ]
Hive QA commented on HIVE-23247: -------------------------------- Here are the results of testing the latest attachment: https://issues.apache.org/jira/secure/attachment/13000525/HIVE-23247.01.patch {color:green}SUCCESS:{color} +1 due to 2 test(s) being added or modified. {color:green}SUCCESS:{color} +1 due to 17134 tests passed Test results: https://builds.apache.org/job/PreCommit-HIVE-Build/21807/testReport Console output: https://builds.apache.org/job/PreCommit-HIVE-Build/21807/console Test logs: http://104.198.109.242/logs/PreCommit-HIVE-Build-21807/ Messages: {noformat} Executing org.apache.hive.ptest.execution.TestCheckPhase Executing org.apache.hive.ptest.execution.PrepPhase Executing org.apache.hive.ptest.execution.YetusPhase Executing org.apache.hive.ptest.execution.ExecutionPhase Executing org.apache.hive.ptest.execution.ReportingPhase {noformat} This message is automatically generated. ATTACHMENT ID: 13000525 - PreCommit-HIVE-Build > Increase timeout for some tez tests > ----------------------------------- > > Key: HIVE-23247 > URL: https://issues.apache.org/jira/browse/HIVE-23247 > Project: Hive > Issue Type: Sub-task > Components: Test > Reporter: Zoltan Haindrich > Assignee: Zoltan Haindrich > Priority: Major > Attachments: HIVE-23247.01.patch, HIVE-23247.01.patch > > > we have a few tez tests which run for ~3.4 seconds with a 5sec timeout > In case these tests run in a more saturated environment they became > unrelyable...and fail regularily -- This message was sent by Atlassian Jira (v8.3.4#803005)