[ 
https://issues.apache.org/jira/browse/HIVE-11777?page=com.atlassian.jira.plugin.system.issuetabpanels:comment-tabpanel&focusedCommentId=14962108#comment-14962108
 ] 

Hive QA commented on HIVE-11777:
--------------------------------



Here are the results of testing the latest attachment:
https://issues.apache.org/jira/secure/attachment/12767119/HIVE-11777.03.patch

{color:green}SUCCESS:{color} +1 due to 1 test(s) being added or modified.

{color:red}ERROR:{color} -1 due to 4 failed/errored test(s), 9697 tests executed
*Failed tests:*
{noformat}
org.apache.hadoop.hive.cli.TestCliDriver.testCliDriver_udf_explode
org.apache.hadoop.hive.cli.TestCliDriver.testCliDriver_udtf_explode
org.apache.hive.hcatalog.api.TestHCatClient.testTableSchemaPropagation
org.apache.hive.jdbc.TestSSL.testSSLVersion
{noformat}

Test results: 
http://ec2-174-129-184-35.compute-1.amazonaws.com/jenkins/job/PreCommit-HIVE-TRUNK-Build/5695/testReport
Console output: 
http://ec2-174-129-184-35.compute-1.amazonaws.com/jenkins/job/PreCommit-HIVE-TRUNK-Build/5695/console
Test logs: 
http://ec2-174-129-184-35.compute-1.amazonaws.com/logs/PreCommit-HIVE-TRUNK-Build-5695/

Messages:
{noformat}
Executing org.apache.hive.ptest.execution.TestCheckPhase
Executing org.apache.hive.ptest.execution.PrepPhase
Executing org.apache.hive.ptest.execution.ExecutionPhase
Executing org.apache.hive.ptest.execution.ReportingPhase
Tests exited with: TestsFailedException: 4 tests failed
{noformat}

This message is automatically generated.

ATTACHMENT ID: 12767119 - PreCommit-HIVE-TRUNK-Build

> implement an option to have single ETL strategy for multiple directories
> ------------------------------------------------------------------------
>
>                 Key: HIVE-11777
>                 URL: https://issues.apache.org/jira/browse/HIVE-11777
>             Project: Hive
>          Issue Type: Bug
>            Reporter: Sergey Shelukhin
>            Assignee: Sergey Shelukhin
>         Attachments: HIVE-11777.01.patch, HIVE-11777.02.patch, 
> HIVE-11777.03.patch, HIVE-11777.patch
>
>
> In case of metastore footer PPD we don't want to call PPD call with all 
> attendant SARG, MS and HBase overhead for each directory. If we wait for some 
> time (10ms? some fraction of inputs?) we can do one call without losing 
> overall perf. 
> For now make it time based.



--
This message was sent by Atlassian JIRA
(v6.3.4#6332)

Reply via email to