[ 
https://issues.apache.org/jira/browse/HIVE-16503?page=com.atlassian.jira.plugin.system.issuetabpanels:comment-tabpanel&focusedCommentId=15982435#comment-15982435
 ] 

Hive QA commented on HIVE-16503:
--------------------------------



Here are the results of testing the latest attachment:
https://issues.apache.org/jira/secure/attachment/12864877/HIVE-16503.3.patch

{color:green}SUCCESS:{color} +1 due to 4 test(s) being added or modified.

{color:red}ERROR:{color} -1 due to 3 failed/errored test(s), 10629 tests 
executed
*Failed tests:*
{noformat}
org.apache.hadoop.hive.cli.TestAccumuloCliDriver.testCliDriver[accumulo_index] 
(batchId=225)
org.apache.hadoop.hive.cli.TestCliDriver.testCliDriver[join45] (batchId=19)
org.apache.hadoop.hive.cli.TestMiniLlapCliDriver.testCliDriver[dynamic_semijoin_user_level]
 (batchId=140)
{noformat}

Test results: https://builds.apache.org/job/PreCommit-HIVE-Build/4862/testReport
Console output: https://builds.apache.org/job/PreCommit-HIVE-Build/4862/console
Test logs: http://104.198.109.242/logs/PreCommit-HIVE-Build-4862/

Messages:
{noformat}
Executing org.apache.hive.ptest.execution.TestCheckPhase
Executing org.apache.hive.ptest.execution.PrepPhase
Executing org.apache.hive.ptest.execution.ExecutionPhase
Executing org.apache.hive.ptest.execution.ReportingPhase
Tests exited with: TestsFailedException: 3 tests failed
{noformat}

This message is automatically generated.

ATTACHMENT ID: 12864877 - PreCommit-HIVE-Build

> LLAP: Oversubscribe memory for noconditional task size
> ------------------------------------------------------
>
>                 Key: HIVE-16503
>                 URL: https://issues.apache.org/jira/browse/HIVE-16503
>             Project: Hive
>          Issue Type: Improvement
>          Components: llap
>    Affects Versions: 3.0.0
>            Reporter: Prasanth Jayachandran
>            Assignee: Prasanth Jayachandran
>         Attachments: HIVE-16503.1.patch, HIVE-16503.2.patch, 
> HIVE-16503.3.patch
>
>
> When running map joins in llap, it can potentially use more memory for hash 
> table loading (assuming other executors in the daemons have some memory to 
> spare). This map join conversion decision has to be made during compilation 
> that can provide some more room for LLAP. 



--
This message was sent by Atlassian JIRA
(v6.3.15#6346)

Reply via email to