[ 
https://issues.apache.org/jira/browse/IGNITE-26101?page=com.atlassian.jira.plugin.system.issuetabpanels:all-tabpanel
 ]

Aditya Mukhopadhyay reassigned IGNITE-26101:
--------------------------------------------

    Assignee: Aditya Mukhopadhyay

> Add Metastore compatibility tests before/after MG repair
> --------------------------------------------------------
>
>                 Key: IGNITE-26101
>                 URL: https://issues.apache.org/jira/browse/IGNITE-26101
>             Project: Ignite
>          Issue Type: Improvement
>            Reporter: Roman Puchkovskiy
>            Assignee: Aditya Mukhopadhyay
>            Priority: Minor
>              Labels: ignite-3
>
> Legend: v1 is original version (3.0), v2 is current version (version from 
> main branch).
> It is supposed that data is written in v1, then the Metastore storage is 
> flushed and the node is stopped, its binary is replaced with v2, the node is 
> started.
> We must test the following scenarios:
>  # MG repair after upgrade
>  ## Metastore is created (and flushed) on v1 for a cluster of 3 nodes (ABC); 
> MG leader is node A
>  ## v2 nodes are started on the same work dirs (only for nodes BC; a is not 
> started)
>  ## MG repair is performed to make B or C a leader
>  # Upgrade after MG repair (perform the same repair steps as above and then 
> do the upgrade)



--
This message was sent by Atlassian Jira
(v8.20.10#820010)

Reply via email to