[ https://issues.apache.org/jira/browse/IGNITE-4074?page=com.atlassian.jira.plugin.system.issuetabpanels:all-tabpanel ]
Vladimir Ozerov updated IGNITE-4074: ------------------------------------ Assignee: Pavel Tupitsyn (was: Vladimir Ozerov) > Refactor async (*future) operations in PlatformTarget > ----------------------------------------------------- > > Key: IGNITE-4074 > URL: https://issues.apache.org/jira/browse/IGNITE-4074 > Project: Ignite > Issue Type: Sub-task > Components: platforms > Reporter: Pavel Tupitsyn > Assignee: Pavel Tupitsyn > Labels: .NET > Fix For: 1.8 > > > Currently async operations are executed in two steps: > - start an operation (Cache.Get) > - get the future (UU.TargetListenFuture* methods) > This separation is unnecessary. See if we can perform asyn operations in one > JNI call. See how PlatformCache.OP_REBALANCE does this. -- This message was sent by Atlassian JIRA (v6.3.4#6332)