[ 
https://issues.apache.org/jira/browse/IGNITE-12181?page=com.atlassian.jira.plugin.system.issuetabpanels:all-tabpanel
 ]

Maxim Muzafarov updated IGNITE-12181:
-------------------------------------
    Ignite Flags:   (was: Docs Required,Release Notes Required)

> Rebalance hangs on BLT change on cluster with in-memory regions
> ---------------------------------------------------------------
>
>                 Key: IGNITE-12181
>                 URL: https://issues.apache.org/jira/browse/IGNITE-12181
>             Project: Ignite
>          Issue Type: Bug
>            Reporter: Maxim Muzafarov
>            Assignee: Maxim Muzafarov
>            Priority: Blocker
>             Fix For: 2.8
>
>         Attachments: RebalanceInMemoryWithPersistence.java
>
>
> # Configured BLT on the _node-1_ (cluster activated)
> # Configured in-memory region with a single cache on the _node-1_
> # A new _node-2_  join to the cluster
> # Set new BLT based on two nodes
> # Rebalance hangs
> Reproducer attached.



--
This message was sent by Atlassian Jira
(v8.3.2#803003)

Reply via email to