[ 
https://issues.apache.org/jira/browse/KYLIN-3673?page=com.atlassian.jira.plugin.system.issuetabpanels:all-tabpanel
 ]

Yichen Zhou updated KYLIN-3673:
-------------------------------
    Summary: Increasing the limit of smoke-test building time  (was: Increase 
smoke-test cube building time)

> Increasing the limit of smoke-test building time
> ------------------------------------------------
>
>                 Key: KYLIN-3673
>                 URL: https://issues.apache.org/jira/browse/KYLIN-3673
>             Project: Kylin
>          Issue Type: Test
>          Components: Tools, Build and Test
>    Affects Versions: v2.5.0
>            Reporter: Yichen Zhou
>            Assignee: Yichen Zhou
>            Priority: Minor
>
> In smoke-test, cube building job which costs more than 20 mins will be 
> treated as failure.
> This time is too short in some cases.



--
This message was sent by Atlassian JIRA
(v7.6.3#76005)

Reply via email to