[ 
https://issues.apache.org/jira/browse/MNG-7860?page=com.atlassian.jira.plugin.system.issuetabpanels:all-tabpanel
 ]

Guillaume Nodet closed MNG-7860.
--------------------------------
      Assignee: Guillaume Nodet
    Resolution: Implemented

> Interleaving of build phases
> ----------------------------
>
>                 Key: MNG-7860
>                 URL: https://issues.apache.org/jira/browse/MNG-7860
>             Project: Maven
>          Issue Type: New Feature
>            Reporter: Christoph Läubrich
>            Assignee: Guillaume Nodet
>            Priority: Major
>
> Currently a project is build bu running all its phases (e.g. [compile, test, 
> package, 
> verify|https://maven.apache.org/guides/introduction/introduction-to-the-lifecycle.html]).
> Lets say we have a multi module build with a module "lib" that contains the 
> basic stuff so other modules depend on it (lets say "feature-a" and 
> "feature-b") and of course we want everything is always fine so we have a lot 
> of test in "lib" in compile scope.
> Currently now "lib" is compiled and "feature-a" and "feature-b" have to wait 
> until it has finished all phases so in the worst a whole build-tree can be 
> blocked from building unless "lib" is finished.
> *What I like to propose* is that there is a way to 'interleave' phases. For 
> example currently 'package' is executed *after* test, but actually it could 
> be performed before hands, also as soon as "lib" has passed its 
> compile/package phase the other projects are allowed to run (because the 
> artifact is already there even though not fully tested).
> Of course this is only a rough description of the idea, e.g. to make this 
> work, one maybe want to have a new 'package-main' phase that is performed 
> right after 'compile' (and probably a package-test phase) ....



--
This message was sent by Atlassian Jira
(v8.20.10#820010)

Reply via email to