[ 
http://jira.codehaus.org/browse/MNG-3566?page=com.atlassian.jira.plugin.system.issuetabpanels:comment-tabpanel&focusedCommentId=133548#action_133548
 ] 

Benjamin Bentmann commented on MNG-3566:
----------------------------------------

bq. This is not available for M209
Are you aware of the description for this phase, which says:
bq. perform any operations necessary to prepare a package before the actual 
packaging. This often results in an unpacked, processed version of the package. 
(*Maven 2.1 and above*)

> Phase prepare-package not available
> -----------------------------------
>
>                 Key: MNG-3566
>                 URL: http://jira.codehaus.org/browse/MNG-3566
>             Project: Maven 2
>          Issue Type: Bug
>          Components: Plugins and Lifecycle
>    Affects Versions: 2.0.9
>            Reporter: Joerg Schaible
>
> The default lifecycle contains a phase prepare-package (according to 
> http://maven.apache.org/guides/introduction/introduction-to-the-lifecycle.html).
>  This is not available for M209, the component.xml in maven-core misses this 
> phase for the 2.0.x series.

-- 
This message is automatically generated by JIRA.
-
If you think it was sent incorrectly contact one of the administrators: 
http://jira.codehaus.org/secure/Administrators.jspa
-
For more information on JIRA, see: http://www.atlassian.com/software/jira

        

Reply via email to