[
https://issues.apache.org/jira/browse/NIFI-15478?page=com.atlassian.jira.plugin.system.issuetabpanels:all-tabpanel
]
Bryan Bende updated NIFI-15478:
-------------------------------
Status: Patch Available (was: Open)
> Components referencing assets can be invalid after asset synchronization
> ------------------------------------------------------------------------
>
> Key: NIFI-15478
> URL: https://issues.apache.org/jira/browse/NIFI-15478
> Project: Apache NiFi
> Issue Type: Bug
> Affects Versions: 2.7.2, 2.7.1, 2.7.0
> Reporter: Bryan Bende
> Assignee: Bryan Bende
> Priority: Major
> Time Spent: 10m
> Remaining Estimate: 0h
>
> When a node joins the cluster it first loads the flow from the coordinator
> and then synchronizes assets with the coordinator. If a controller service
> references an asset that wasn't present when the flow was loaded and is then
> added during synchronization, the service is remaining invalid and never
> seeing the presence of the asset, even though it is now there. This appears
> to have started happening after the changes in [NIFI-15267
> title|https://issues.apache.org/jira/browse/NIFI-15267]
--
This message was sent by Atlassian Jira
(v8.20.10#820010)