Gábor Gyimesi created MINIFICPP-2916:
----------------------------------------
Summary: Move manifest check job under docker build
Key: MINIFICPP-2916
URL: https://issues.apache.org/jira/browse/MINIFICPP-2916
Project: Apache NiFi MiNiFi C++
Issue Type: Improvement
Reporter: Gábor Gyimesi
Assignee: Gábor Gyimesi
Fix For: 1.1.0
Currently manifest checker job is under the clang build which causes a problem.
When the check fails it interrupts the job flow and the jobs after the manifest
check do not run, so the failures of the jobs afterwards like the clang-tidy
job are only revealed when the manifest is fixed. We should move the manifest
check to a separate job that uses the docker build so no other job depends on
its result.
--
This message was sent by Atlassian Jira
(v8.20.10#820010)