[
https://issues.apache.org/jira/browse/HDDS-5139?page=com.atlassian.jira.plugin.system.issuetabpanels:all-tabpanel
]
Aravindan Vijayan reassigned HDDS-5139:
---------------------------------------
Assignee: Ethan Rose
> Restructure the acceptance test groups (unsecure/secure/misc)
> -------------------------------------------------------------
>
> Key: HDDS-5139
> URL: https://issues.apache.org/jira/browse/HDDS-5139
> Project: Apache Ozone
> Issue Type: Sub-task
> Reporter: Marton Elek
> Assignee: Ethan Rose
> Priority: Blocker
>
> Ozone executes the acceptance test parallel.
> On master we execute secure (1h38m) unsecure (42m) and misc (1h6m).
> Upgrade branch has secure (2h6m) unsecure (42m) and acceptance (1h13m)
> While some increase in the build time is necessary to run upgrade/downgrade
> scenario we can adjust the parallel execution and instead of increasing the
> build time of the slowest (secure) job we can add the new tests to the
> fastest (unsecure) job.
> While we would use the same build resources, the overall time of build can be
> significant faster (less time to wait until the build is finished)
> This task is as easy as adding "#suite:unsecure" tags to the right test.sh
> scripts (I guess to the compose/upgrade/test.sh)
> Please note that HDDS-5125 is just merged to the master, so we need to merge
> master back to the branch to get the up-to-date numbers.
--
This message was sent by Atlassian Jira
(v8.3.4#803005)
---------------------------------------------------------------------
To unsubscribe, e-mail: [email protected]
For additional commands, e-mail: [email protected]