[
https://issues.apache.org/jira/browse/SENTRY-1454?page=com.atlassian.jira.plugin.system.issuetabpanels:comment-tabpanel&focusedCommentId=15440273#comment-15440273
]
Anne Yu commented on SENTRY-1454:
---------------------------------
Yeah, but it's difficult to combine these two from this particular jira. I am
thinking of checking in this one to unblock post commit then rebase
SENTRY-1377, which can happen anytime later, in a more flexible schedule. The
main purpose for this jira is to ensure no time out. Refactor can continue
going on.
> Fix intermittent time out issue for TestHDFSIntegration
> -------------------------------------------------------
>
> Key: SENTRY-1454
> URL: https://issues.apache.org/jira/browse/SENTRY-1454
> Project: Sentry
> Issue Type: Sub-task
> Components: Sentry
> Affects Versions: 1.8.0
> Reporter: Anne Yu
> Assignee: Anne Yu
> Attachments: SENTRY-1429.0.patch
>
>
> Occasionally there are time out issues from TestHDFSIntegration. It turns out
> it contains 45 test functions and runs over 10m. Need to split the tests into
> smaller size class file. And testAccessToTableDirectory sometimes if flaky.
--
This message was sent by Atlassian JIRA
(v6.3.4#6332)