[ 
https://issues.apache.org/jira/browse/SPARK-27565?page=com.atlassian.jira.plugin.system.issuetabpanels:all-tabpanel
 ]

Apache Spark reassigned SPARK-27565:
------------------------------------

    Assignee:     (was: Apache Spark)

> Show job info of WholeStageCodegen node on SparkSQL UI page
> -----------------------------------------------------------
>
>                 Key: SPARK-27565
>                 URL: https://issues.apache.org/jira/browse/SPARK-27565
>             Project: Spark
>          Issue Type: Improvement
>          Components: SQL, Web UI
>    Affects Versions: 3.0.0
>            Reporter: peng bo
>            Priority: Major
>         Attachments: SPARK-27565.jpg
>
>
> Currently it's really hard to link SQL plan to Spark jobs on SparkSQL UI 
> page. When one job failed, which {{PhysicalPlan}} nodes are involved are 
> difficult to be located. This PR is to show the job info of 
> {{WholeStageCodegen}} node on SparkSQL UI page to make life easier.
> Each {{WholeStageCodegen}} node has a task metric 
> {{PIPELINE_DURATION_METRIC}} which records the total duration time shown in 
> the top right. The idea is to put the job info into its metric value during 
> metric aggregation.



--
This message was sent by Atlassian JIRA
(v7.6.3#76005)

---------------------------------------------------------------------
To unsubscribe, e-mail: issues-unsubscr...@spark.apache.org
For additional commands, e-mail: issues-h...@spark.apache.org

Reply via email to