[ https://issues.apache.org/jira/browse/TC-44?page=com.atlassian.jira.plugin.system.issuetabpanels:all-tabpanel ]
Eric Friedrich updated TC-44: ----------------------------- Fix Version/s: (was: 1.9.0) 2.1.0 > TR fd leak observed when new HTTPS DS is added without certificate > ------------------------------------------------------------------ > > Key: TC-44 > URL: https://issues.apache.org/jira/browse/TC-44 > Project: Traffic Control > Issue Type: Bug > Components: Traffic Router > Affects Versions: 1.7.0 > Reporter: John Shen > Assignee: John Shen > Fix For: 2.1.0 > > > In TC 1.7, when a new HTTPS DS (HTTP 302 routing) is added without > certificate, there will be fd leak observed on TR. The connections to TM stay > in CLOSE-WAIT, which begins to show ~20mins after a new DS without cert/key > is added. > And CrState appears to be blocked in ~20mins as well, i.e. no request from TR > to TM to fetch CrState. -- This message was sent by Atlassian JIRA (v6.3.15#6346)