hi,

We are using the ant command (with a build.xml config file) for api 
integration test, and using the mvn command (with modified pom.xml file) 
for unit test. Both work fine and can generate reports.

Now we want to merge these two together. Why? We assume that some code are 
covered by the integration test, some other code are covered by the unit 
test. Of course, some code are probably covered by both tests. We'd like to 
get an overall coverage report, no matter covered by which test.

I'm thinking of using the 'ant ... merge' command to merge all the .exec 
files generated by both tests, and then using the 'ant ... report' command 
generate the reports. But I have two questins.

1. The 'ant ... merge' command does generate a result .exec file, but does 
it contain the correct date? For example, if some code are covered by both 
types of test, can the result be merged correctly here?

2. The build.xml file used in 'ant ... report' command specifies the class 
files and the source code location. I tried using the build.xml used for 
integration test, and did get the reports. I guess this is ok, assuming the 
code used for unit test is the same version as that for integration test?

Thanks.
--huafeng

-- 
You received this message because you are subscribed to the Google Groups 
"JaCoCo and EclEmma Users" group.
To unsubscribe from this group and stop receiving emails from it, send an email 
to [email protected].
To view this discussion on the web visit 
https://groups.google.com/d/msgid/jacoco/6efbf509-5e34-48e4-af9f-b1c3c9618156%40googlegroups.com.

Reply via email to