Changing one server file and rebuilding to test is
taking on the order of 2 minutes
where this takes 5 seconds previously. There should
be an intermediate build
target that builds the server without all of the
doc steps being run as currently is
the case.
|
- Re: [JBoss-dev] A downside to the new build scheme Scott M Stark
- Re: [JBoss-dev] A downside to the new build scheme Jason Dillon
- Re: [JBoss-dev] A downside to the new build scheme Jason Dillon
- Re: [JBoss-dev] A downside to the new build scheme Scott M Stark
- Re: [JBoss-dev] A downside to the new build sch... Jason Dillon