Use Case 5(Update DataSource) has been completed both basic flow and alternate 
flows. Extension point 5.1 (Test DataSource) was implemented as part of use 
case 1 (View list of Datasources). 

Goal
A DataSource is successfully updated.

Basic flow of events
1. The user indicates to the system that they wish to update a particular 
DataSource.
2. The system displays the list of existing attributes for the DataSource for 
the user
to update.
3. The user updates some attributes and indicates to the system to update the
DataSource with the given settings.
4. The system takes the information entered by the user, validates it and 
updates the
existing DataSource.
5. The system indicates to the user that the DataSource was successfully 
updated.
6. The use case ends.

Alternate flows
A5.1: Information validation fails, DataSource not updated
During step 4) of the Basic Flow. This alternate flow is exactly analogous to 
A4.1, leaving the DataSource unchanged.
A5.2: Information validation fails, user fixes problem
This alternate flow is exactly analogous to A4.2, eventually updating the 
DataSource.
A5.3: User cancels update
During step 3) of the Basic Flow. This alternate flow is exactly analogous to 
A4.3, leaving the DataSource unchanged.

View the original post : 
http://www.jboss.org/index.html?module=bb&op=viewtopic&p=3867021#3867021

Reply to the post : 
http://www.jboss.org/index.html?module=bb&op=posting&mode=reply&p=3867021


-------------------------------------------------------
SF email is sponsored by - The IT Product Guide
Read honest & candid reviews on hundreds of IT Products from real users.
Discover which products truly live up to the hype. Start reading now.
http://ads.osdn.com/?ad_id=6595&alloc_id=14396&op=click
_______________________________________________
JBoss-Development mailing list
[email protected]
https://lists.sourceforge.net/lists/listinfo/jboss-development

Reply via email to