I'm new to BPM and I'm starting to evaluate the jBPM 
(jbpm-jpdl-suite-3.2.2.zip).
Which are the steps to use the "Configure task" check box? When I check this 
box appear some tabs (General, Details, Assignment, Controller, Reminder). If I 
want define some input fields I must use Details--->Generate Form or 
Controller--->Choose--->Default....???
thanks.

View the original post : 
http://www.jboss.com/index.html?module=bb&op=viewtopic&p=4113702#4113702

Reply to the post : 
http://www.jboss.com/index.html?module=bb&op=posting&mode=reply&p=4113702
_______________________________________________
jboss-user mailing list
jboss-user@lists.jboss.org
https://lists.jboss.org/mailman/listinfo/jboss-user

Reply via email to