WS-BPEL 2 is a specification that only recently reached status as a standard. jBPM and the BPEL editor currently support different, incompatible draft versions of the specification.
The jBPM BPEL Quick Start with Eclipse Designer Guide provides instructions for interworking with jBPM BPEL 1.1.Beta1 and Eclipse BPEL 0.2.0. This guide describes the use of Ant scripts for process deployment. No updated revision of this document exists for jBPM BPEL 1.1.Beta3, because we are currently working on process deployment via the Eclipse BPEL runtime framework. Watch issue BPEL-216 if you'd like to track this feature. View the original post : http://www.jboss.com/index.html?module=bb&op=viewtopic&p=4021823#4021823 Reply to the post : http://www.jboss.com/index.html?module=bb&op=posting&mode=reply&p=4021823 _______________________________________________ jboss-user mailing list jboss-user@lists.jboss.org https://lists.jboss.org/mailman/listinfo/jboss-user