Pedro Pessoa <[EMAIL PROTECTED]> writes:
No, this functionality is in the todo list.
The code need to change to provide a history per build file.

Javier

> Hi!
> 
> Can anyone tell me if it is possible, while working on two projects at the same
> time, have the jde-build "remember" which ant task was used previously for each
> project, and not only the previous one (usualy the other project's from which I
> switched).
> 
> Thanks.
> 
> -- 
> Pedro Pessoa
> Siemens S.A. IC R&D ON TMN BD BSW 1
> Rua Irmãos Siemens No. 1, Alfragide
> P-2720-093 Amadora
> Phone +351 21 424 2550
> Fax +351 21 424 2337
> 
> 

-- 
Javier S. Lopez                 
[EMAIL PROTECTED]            Forum Systems, Inc.
(781) 788-4206                  95 Sawyer St., Suite 110,
http://www.forumsys.com         Waltham, MA 02453

Reply via email to