Pedro Pessoa <[EMAIL PROTECTED]> writes: No, this functionality is in the todo list. The code need to change to provide a history per build file.
Javier > Hi! > > Can anyone tell me if it is possible, while working on two projects at the same > time, have the jde-build "remember" which ant task was used previously for each > project, and not only the previous one (usualy the other project's from which I > switched). > > Thanks. > > -- > Pedro Pessoa > Siemens S.A. IC R&D ON TMN BD BSW 1 > Rua Irmãos Siemens No. 1, Alfragide > P-2720-093 Amadora > Phone +351 21 424 2550 > Fax +351 21 424 2337 > > -- Javier S. Lopez [EMAIL PROTECTED] Forum Systems, Inc. (781) 788-4206 95 Sawyer St., Suite 110, http://www.forumsys.com Waltham, MA 02453