The 2.516.1-rc will be delayed at least one day while we repair a mistake that I made during the preparation of the first backporting pull request.
The mistake I made was to skip one item in the Jenkins LTS 2.516.1 release checklist. That item says: Open a pull request towards the acceptance test harness and plugin compatibility test to confirm the incremental produced by the backporting PR doesn't contain regressions. As a consequence of my mistake, a change that causes ATH test failures was merged to the Jenkins stable-2.516 branch. A pull request has been proposed for the master branch that is confirmed to fix the acceptance test harness failure. I hope all can be resolved by end of day tomorrow so that the release candidate availability is only delayed by one day. Thanks, Mark Waite -- You received this message because you are subscribed to the Google Groups "Jenkins Developers" group. To unsubscribe from this group and stop receiving emails from it, send an email to [email protected]. To view this discussion visit https://groups.google.com/d/msgid/jenkinsci-dev/8c815c41-fe19-4ebc-8fa2-be809a37b0fbn%40googlegroups.com.
