Hi, We are using the Build Flow Plugin in Jenkins. This is scenario:
Start the flow 1: Job1 -> Job2 -> Job3 .... Start the flow 2: Job1 -> Job2 -> Job3 .... Start the flow 3: Job1 -> Job2 -> Job3 .... The same flow is started 3 times with a few minutes delay between them. We have noticed that thought the Job2 in the flow 3 is finished, it hangs on upstream notification and the Job3 within the same flow 3 could not be started. It waits until the Job2 in flow1 is finished and Job2 in flow2 is finished. Is it how it always works? The same job started in parallel (several execution of the same test flow on different resources) tends to become a serial? Start Job2 flow1 Start Job2 flow2 Start Job2 flow3 Finish Job2 flow1 Finish Job2 flow2 Finish Job2 flow3 Is it possible to start as above but finish like this: Finish Job2 flow3 and start Job3 Finish Job2 flow2 and start Job3 Finish Job2 flow1 and start Job3 Or there is something in configuration we are missing? The job is configured to be executed in parallel. Any ideas? How we can make the flow 3 to finish thought the Job2 in flow1 takes long time to execute? Regards /Zofia -- You received this message because you are subscribed to the Google Groups "Jenkins Users" group. To unsubscribe from this group and stop receiving emails from it, send an email to jenkinsci-users+unsubscr...@googlegroups.com. For more options, visit https://groups.google.com/groups/opt_out.