I added a Loop Controller to the TheadGroup and set the number of iteration from
infinite to something else.
-----Original Message-----
From: "Stover, Michael" <[EMAIL PROTECTED]>
Date: Wed, 22 Aug 2001 08:35:50 -0400
To: "'[EMAIL PROTECTED]'" <[EMAIL PROTECTED]>
Subject: RE: rg. jmeter visualizers
> I checked the Loop controller and it seemed to work OK. Are you setting the
> one built into the ThreadGroup, or did you add one to the test and then
> configure it?
>
> -Mike
>
> > -----Original Message-----
> > From: neth6 atozasia.com [mailto:[EMAIL PROTECTED]]
> > Sent: Wednesday, August 22, 2001 6:28 AM
> > To: [EMAIL PROTECTED]
> > Cc: [EMAIL PROTECTED]
> > Subject: Re: rg. jmeter visualizers
> >
> >
> > thanks for the feedback.
> >
> > if u've downloaded the nightly builds recently then u'll have
> > a visualizer called GraphFull Results. This graph is useful
> > to find out how much time each components(images, applets
> > etc) of the html page take from an overall perspective. NOTE
> > : sampling the page at least 10 times to get a good plot.
> > Currently, I'm having problems getting the Loop Controller to
> > stop looping after nth times. It's always looping forever!!!
> > I must have build something wrongly =). Anyway that's
> > another matter. You can do the alternative by setting 10
> > threads with each sampling the url sample once only (done
> > with Once-Only Controller).
> >
> > For multi-thread samplings with more than one pages per
> > thread, I intend to group those samples of the same pages
> > together and display them in this manner otherwise. Can't
> > think of any other way for it to make sense.
> >
> > neth
> > -----Original Message-----
> > From: "jaideep mehta" <[EMAIL PROTECTED]>
> > Date: Tue, 21 Aug 2001 13:38:27 +0000
> > To: [EMAIL PROTECTED]
> > Subject: rg. jmeter visualizers
> >
> >
> > > hi neth
> > >
> > > good to see u taking initiative in developing new visualisers.
> > >
> > > i think of some additions that u may consider for your first graph.
> > >
> > > its like what ur 1st graph is like mapping of View Results
> > listener but i
> > > think if u map ViewResults tree it would be more useful.
> > >
> > > it would be like for first sample what is total time for
> > loading whole
> > > sample and within it whats the breakup of various parts and
> > so on for all
> > > samples.
> > >
> > > i have attached a .bmp showing what i mean.see if this idea
> > helps u in
> > > anyway.
> > >
> > > thanx a lot.
> > >
> > > jaideep
> > >
> > >
> > >
> > >
> > >
> > > _________________________________________________________________
> > > Get your FREE download of MSN Explorer at
> http://explorer.msn.com/intl.asp
> >
>
> --
>
> __________________________________________________
> Get FREE 50 MB email @ http://www.AtoZasia.com
>
>
>
> Powered by Outblaze
>
> ---------------------------------------------------------------------
> To unsubscribe, e-mail: [EMAIL PROTECTED]
> For additional commands, e-mail: [EMAIL PROTECTED]
>
> ---------------------------------------------------------------------
> To unsubscribe, e-mail: [EMAIL PROTECTED]
> For additional commands, e-mail: [EMAIL PROTECTED]
>
>
--
__________________________________________________
Get FREE 50 MB email @ http://www.AtoZasia.com
Powered by Outblaze
---------------------------------------------------------------------
To unsubscribe, e-mail: [EMAIL PROTECTED]
For additional commands, e-mail: [EMAIL PROTECTED]