DO NOT REPLY TO THIS EMAIL, BUT PLEASE POST YOUR BUG 
RELATED COMMENTS THROUGH THE WEB INTERFACE AVAILABLE AT
<http://nagoya.apache.org/bugzilla/show_bug.cgi?id=17843>.
ANY REPLY MADE TO THIS MESSAGE WILL NOT BE COLLECTED AND 
INSERTED IN THE BUG DATABASE.

http://nagoya.apache.org/bugzilla/show_bug.cgi?id=17843

need an option to set a time period for the Jmeter  test run 

           Summary: need an option to set a time period for the Jmeter  test
                    run
           Product: JMeter
           Version: 1.8.1
          Platform: Sun
        OS/Version: Solaris
            Status: NEW
          Severity: Enhancement
          Priority: Other
         Component: Main
        AssignedTo: [EMAIL PROTECTED]
        ReportedBy: [EMAIL PROTECTED]


Currently jmeter only allow user run the testplan with two options: loop number
or forever. But I need to set a time period for my test plan. For example, I
want to run my testplan for 3 days. But I can't find a way to do it.

---------------------------------------------------------------------
To unsubscribe, e-mail: [EMAIL PROTECTED]
For additional commands, e-mail: [EMAIL PROTECTED]

Reply via email to