DO NOT REPLY TO THIS EMAIL, BUT PLEASE POST YOUR BUG RELATED COMMENTS THROUGH THE WEB INTERFACE AVAILABLE AT <http://nagoya.apache.org/bugzilla/show_bug.cgi?id=17843>. ANY REPLY MADE TO THIS MESSAGE WILL NOT BE COLLECTED AND INSERTED IN THE BUG DATABASE.
http://nagoya.apache.org/bugzilla/show_bug.cgi?id=17843 need an option to set a time period for the Jmeter test run Summary: need an option to set a time period for the Jmeter test run Product: JMeter Version: 1.8.1 Platform: Sun OS/Version: Solaris Status: NEW Severity: Enhancement Priority: Other Component: Main AssignedTo: [EMAIL PROTECTED] ReportedBy: [EMAIL PROTECTED] Currently jmeter only allow user run the testplan with two options: loop number or forever. But I need to set a time period for my test plan. For example, I want to run my testplan for 3 days. But I can't find a way to do it. --------------------------------------------------------------------- To unsubscribe, e-mail: [EMAIL PROTECTED] For additional commands, e-mail: [EMAIL PROTECTED]