DO NOT REPLY TO THIS EMAIL, BUT PLEASE POST YOUR BUGĀ· RELATED COMMENTS THROUGH THE WEB INTERFACE AVAILABLE AT <http://issues.apache.org/bugzilla/show_bug.cgi?id=35523>. ANY REPLY MADE TO THIS MESSAGE WILL NOT BE COLLECTED ANDĀ· INSERTED IN THE BUG DATABASE.
http://issues.apache.org/bugzilla/show_bug.cgi?id=35523 ------- Additional Comments From [EMAIL PROTECTED] 2005-06-29 15:54 ------- In the Test Plan I selected the "Run each Thread Group separately" option. I did not specify a start/end or duration time. I input 60 for the Startup Delay which should override the start/end/duration times. Here's what I have: Test Plan with 3 Thread Groups; The Test Plan's "Run each Thread Group separately" option is selected; In each Thread Group I have the "Scheduler" checked and have input 60 in the "Startup delay" field; Thread Group 1 - 10 Threads, Loop 100; Thread Group 2 - 25 Threads, Loop 100; Thread Group 3 - 50 Threads, Loop 100. When I run the Test, Thread Group 1 Loops 100 times. Thread Group 2 waits 60 seconds before starting, but it does not Loop. It only performs the test 25 times (which is the number of Threads specified). Thread Group 3 waits 60 seconds before starting and does not Loop. It only performs the test 50 times (which is the number of Threads specified). -- Configure bugmail: http://issues.apache.org/bugzilla/userprefs.cgi?tab=email ------- You are receiving this mail because: ------- You are the assignee for the bug, or are watching the assignee. --------------------------------------------------------------------- To unsubscribe, e-mail: [EMAIL PROTECTED] For additional commands, e-mail: [EMAIL PROTECTED]
