Use the Transaction Controller.

On 20/11/06, Ravindra Gupta <[EMAIL PROTECTED]> wrote:
Hi All,

I have to calculate total time taken by a process to complete eg. the
process to complete depends upon the the two pages respectively. How
could I figureout the total time taken by the process to complete,
although its the sum of the two pages to load but how J meter
calculate this.

Situation is something like this:

xxx.jsp
(Post method)- Data creation process starts. After sometime the
process is diverted to other page. (say it takes x time)

yyy.jsp
Here the process ends. Say It takes y time.

How could I find the sum of (x+y) in Jmeter? I need the total time as output.

Thanks in Advance,
Ravindra

---------------------------------------------------------------------
To unsubscribe, e-mail: [EMAIL PROTECTED]
For additional commands, e-mail: [EMAIL PROTECTED]



---------------------------------------------------------------------
To unsubscribe, e-mail: [EMAIL PROTECTED]
For additional commands, e-mail: [EMAIL PROTECTED]

Reply via email to