Hi,
I am trying to simulate a production load with JMeter. The load I am trying to
simulate is to produce roughly 7 requests per second for 1 whole hour. I have
created several plans to try to simulate the load, e.g. 7 concurrent users, but
I think this is not the same as saying 7 requests per second per hour. I have
also tried using throughput timer and again, I am not sure if it is right.
Is there a way (with some kind of Timer maybe?) to ensure that my test plan can
produce x requests per second? Or is there are way to get that statistic with
a given plan.
Thanks
Liang
_________________________________________________________________
Looking for a new home? With all the latest places, searching has never been
easier.
http://clk.atdmt.com/NMN/go/157631292/direct/01/