I have a number of JMeter tests set to run with different numbers of users. Once one test finishes, another should start. I am running into a problem where the ant task calling the JMeter test gets stuck waiting for the test to finish. Is there some setting in ant or in JMeter where I can specify the absolute time limit for the test to run and have it forcibly shut down if it hits that limit? I am using the Duration setting in the main thread group to control how long the test should run, but I am running into cases where it gets ignored.
-- -- Brian Devaney DocFinity® by Optical Image Technology, Inc. 100 Oakwood Avenue, State College, PA 16803 ph: 814.238.0006 ext. 274 fax: 814.238.0011 mailto:[email protected] http://www.docfinity.com/ DISCLAIMER: This email may contain proprietary information, some or all of which may be legally privileged. It is for the intended recipient only. If an addressing or transmission error has misdirected this email, please notify the author by replying to this email. If you are not the intended recipient, you may not use, disclose, distribute, copy, print, or rely on this email.

