Hello .. I have a juniper router m10i series, but when i try to ugrade the junos version from 8.2 to 8.4 the router stop the process and show the next error when it makes the validation of the configuration
Chassis control process: 'graceful-switchover' Chassis control process: Graceful switchover configured! *mgd: error: configuration check-out failed Validation failed WARNING: Current configuration not compatible with /var/tmp/jinstall-8.4R3.3-domestic-signed.tgz * if i use the no-validate option the upgrade is succesful , but my question is .. What happend if i do that ... could i have problems with my configuration ?? i am upgrading the backup RE, so i need to upgrade from 8.2 to 9.4 so i made that in this order 8.2R2.4 -->8.4R3.3 -->8.5R4.3-->9.3R2.8-->9.4R4.5 but in all upgrades i used the no-validate option, in this way the upgrade was succesful .. my quesion is if i can do that (use the no-validate option) and after make a "commit synchronize" from de Master RE and all should works OK when i make "request chassis routing-engine master switch " . Or i have a lot of risks because the validation failed .. or what can i do in order to have the minor risks in the upgrade ,, thanks so much .. _______________________________________________ juniper-nsp mailing list [email protected] https://puck.nether.net/mailman/listinfo/juniper-nsp

