In the later JUNOS versions, whle using CFM model of OAM, we an option of "interface-down" in action-profile, which can bring down the interface is CFM is down. I've not personally tested, but heard it seems to work.
Cheers 2012/3/6 Ben Dale <bd...@comlinx.com.au> > > On 06/03/2012, at 7:38 PM, Jose María Carrera wrote: > > > hello there > > > > Is there anyway to tear down the interface when the interface included > in the VPLS is not directly connected to the CE, but to one switch in > between? > > If the setup is as follows > > > > PE------SW------CE > > > > If the interface between SW and CE goes down, the interface between PE > and SW is still up and the multihomed VPLS does not switchover > > > > Do you know if there's a way sort this out? > > If the switch supports it (like EX or many others), use OAM / > link-fault-management. > _______________________________________________ > juniper-nsp mailing list juniper-nsp@puck.nether.net > https://puck.nether.net/mailman/listinfo/juniper-nsp > _______________________________________________ juniper-nsp mailing list juniper-nsp@puck.nether.net https://puck.nether.net/mailman/listinfo/juniper-nsp