Hi Experts,
We have two ex-4200 switches placed in two buildings, 400 to 500 meters
apart.The switches are connected through a Trunk interface (through a fiber
link and media-converters on both sides)
We are thinking of running VC between these switches.As per my understanding I
will need two uplink modules (2x XFP, or 4x SFP), and XFPs or SFPs, I guess I
need at least two links for redundancy.
Has anyone experienced running VC using uplink ports, using 1G ports or 10G
ports, is there anything I need to watch for, is it a reliable/workable
solution?
Appreciate your inputs.
ThanksAbdullah BaheerĀ (JNCIE-M # 1402)
_______________________________________________
juniper-nsp mailing list juniper-nsp@puck.nether.net
https://puck.nether.net/mailman/listinfo/juniper-nsp