https://bugs.kde.org/show_bug.cgi?id=523249

            Bug ID: 523249
           Summary: start time of event spanning midnight shows on second
                    day in month view (as if it was end time)
    Classification: Applications
           Product: Merkuro
      Version First 26.04.3
       Reported In:
          Platform: Other
                OS: Linux
            Status: REPORTED
          Severity: normal
          Priority: NOR
         Component: general
          Assignee: [email protected]
          Reporter: [email protected]
                CC: [email protected]
  Target Milestone: ---

Created attachment 194438
  --> https://bugs.kde.org/attachment.cgi?id=194438&action=edit
Event spanning midnight in month view: What seems like the event's end time is
its start time.

DESCRIPTION
I use events that are spanning two days (with precise start and end time, not
whole-day events) to inscribe my overnight workshifts in Merkuro Calendar. In
month view, this appears as: colored dot, event title, colored line crossing
day column separator, start time. So the start time is in the box of the end
day under the end day number, suggesting it is the event's end time.

STEPS TO REPRODUCE
Create not-whole-day events spanning over two days. Go to month view.

OBSERVED RESULT
The start time appears on the second day at the end of the column crossing
line, wrongly signifying it is the end of the event.

EXPECTED RESULT
As in events not spanning multiple days, the start time should be next to the
event title in the box of the start day: Colored dot, event title, start time,
colored line crossing day column separator, to not confuse start and end time.

SOFTWARE/OS VERSIONS
Fedora 44
KDE Plasma 6.7.3 
KDE Frameworks 6.28.0
Qt 6.11.1

-- 
You are receiving this mail because:
You are watching all bug changes.

Reply via email to