https://bugs.kde.org/show_bug.cgi?id=479854

            Bug ID: 479854
           Summary: The tool "Align sub-operation date..." don't update an
                    operation
    Classification: Applications
           Product: skrooge
           Version: 2.27.0
          Platform: Kubuntu
                OS: Linux
            Status: REPORTED
          Severity: normal
          Priority: NOR
         Component: general
          Assignee: steph...@mankowski.fr
          Reporter: vo.publi...@gmail.com
  Target Milestone: ---

SUMMARY
The tool "Align sub-operation date..." don't update one selected operation (the
last, ones with different dates in sub-operation), in an account view.

STEPS TO REPRODUCE
1. Open an account view
2. Select manually multiple operations that contain some suboperation unaligned
3. Activate the "Align suboperation date..." tool

OBSERVED RESULT
One operation is not updates: suboperation has still unaligned date.

EXPECTED RESULT
All operations should be modified.

ADDITIONAL INFORMATION
The problem occurs on the last selected operation (in date, not in the
selection).
I try again after open a special view with the non-aligned date operations ,
and this operation was updated correctly...
This operation has also 3 sub-operation, 2 non aligned and one with the correct
date (the last one).

Suggestions:
- pb on account view only, on the last selected operation 
- pb because partially aligned
- pb because the last in date
...

-- 
You are receiving this mail because:
You are watching all bug changes.

Reply via email to