Collins said:Paul, when you say you are doing the final prep to fiberglass the top of your rt. wing...? You do mean top and leading edge and bottom of the leading edge back to the rear of the lower exposed main spar all in one go I presume?........ ?My final prep consistent of fillings voids and checking the spars for high spots.?I fiberglassed the top of the Rt wing today. ?The plans call for two ?BID layers from the fwd spar around the leading edge to three inches below the L/E cordline and one layer from the fwd spar to the T/E. ?I didn't like the how the edge of the ?two layers ended just below the L/E. So I extended the second layer back to the back edge of the bottom side of the fwd spar. I'll do the same when I do the bottom wing.?
Paul Visk?Belleville Il. 618-406-4705 -------------- next part -------------- A non-text attachment was scrubbed... Name: 20161211_190741_resized.jpg Type: image/jpeg Size: 173024 bytes Desc: not available URL: <http://list.krnet.org/mailman/private/krnet_list.krnet.org/attachments/20161211/7636ea33/attachment.jpg>