I meant to add a couple of thoughts. I found it pretty difficult to write down all the parameters and times during flight tests and such. It was big help to use a video camera pointed at the instrument panel with the date/time stamp running. That way I could go back and confirm time to climb/indicated air speeds etc. I can get pretty exciting flying an airplane in the test phase. The camera meant I could concentrate on flying.
I had no issues with this plan presented to the DAR. I also had just a 1 sheet summary page I presented to him as well. It just listed the basics for the plan in 10 hour blocks, i.e. 10 hours Initial flight stability tests/ 20 hours - Cruise testing/stall testing/climb testing, 10 hours - weight and balance testing. Something like that if I recall correctly. I think that was what he really wanted, and not the extended test plan. Thanks, Rob In a message dated 2/25/2012 11:06:08 A.M. Central Standard Time, [email protected] writes: Sorry, I would have posted sooner, but I was out of town this week on business. I've got a series of flight test plans I used for my Trigear Revmaster powered KR2S. Links to the files are on my web site at _http://www.robert7721.com/FlightTesting.html_ (http://www.robert7721.com/FlightTesting.html) I started with the Rick Junkin's plan, and then I used a RV test plan for the later flights. Both were modified for my specific KR. Thanks, Rob Schmitt N1852Z _www.robert7721.com_ (http://www.robert7721.com/)

