We're now in the critical section with pqm in rc mode. rev 10480 of db-stable was merged to devel and we should have the qastaging application of the schema changes ready to go in ~5 hours when buildbot finishes with testing devel. If we can us asiapac folk will get a losa to apply the change to qastaging before EOD, otherwise with the UK public holiday someone in US tz will need to pick this up and run with it. The remaining steps are to check the application time and that everything is happy on qastaging. If thats all good *and* we are qaed up to the db-stable merge we can take pqm out of rc mode.
Separately, we need an incremental db patch to unbreak db-stable rev 10481 (see the thread Francis started on Friday about patch-2208-65-0 failing); if that gets sorted, we need to do another merge from db-stable to devel (and another rc-mode critical section). Cheers, Rob _______________________________________________ Mailing list: https://launchpad.net/~launchpad-dev Post to : [email protected] Unsubscribe : https://launchpad.net/~launchpad-dev More help : https://help.launchpad.net/ListHelp

