But, as Matthew pointed out, only the parent project seems to have been
added to source; the core and webapp aren't suffixed with their SVN
location in the Package Explorer. And I don't see your pom files in Windows
Explorer for some reason. Again, we have a modules block in our parent
structure that lists the chid projects. The parent was shared (as a folder
with a pom) then the two projects were shared as subfolders beneath it.
Then when we check out the trunk using "Check Out As Maven Project" we get
a "root" project in Package Explorer for the parent and another one each
for the actual projects. Then if we drill down through the parent, as we
rarely do, we do see the hierarchy - which we use mostly for our build
process. Sorry not sure what you're missing exactly :(

Craig

On Fri, Jun 1, 2012 at 4:25 AM, tong123123 <[email protected]> wrote:

> The problem is in window explorer, the project sturcture is the two child
> are directly under the parent (as in m2eclipse3.png).
> but after imported with m2eclipse, the structure become one parent with
> two child, and then the two child has its own project itself!! (as in
> m2eclipse2.png)
> I use "team > shared" to put the parent and two child in svn, but the
> magic created child own project...how to handle it?
> For clear, I attach the parent(viewer.project) and the two child(core,
> webapp) eclipse .poject file also.
>
>   ------------------------------
> *寄件人︰* Matthew Piggott <[email protected]>
> *收件人︰* Maven Integration for Eclipse users mailing list <
> [email protected]>
> *傳送日期︰* 2012年05月29日 (週二) 9:24 PM
> *主題︰* Re: [m2e-users] one parent with 2 children
>
> Looking at your image the two child projects aren't shared with SVN.
>
> On 29 May 2012 07:17, Igor Fedorenko <[email protected]> wrote:
>
> The three workspace projects are mapped to the same directory tree on
> the filesystem. Use parent project to commit changes to svn, this will
> commit changes to module projects too.
>
> --
> Regards,
> Igor
>
>
> On 12-05-29 6:08 AM, tong123123 wrote:
>
> as the attached image shown, in m2eclipse, if I have one parent project
> and two child projects, when import to m2eclipse, the layout becomes
> three project, one is
> parent
> ---------child1
> ---------child2
>
> the second is
> child1
>
> the third is
> child2
>
> and if I change child1 in second project, it will synchronize with the
> child1 in parent project.
> But now I have svn commit parent and two childs project, so the first
> parent
> ---------child1
> ---------child2
> has svn symbol for change and can check check from repository, but the
> second and third project cannot!!
>
> how to handle this case?
>
>
> ______________________________**_________________
> m2e-users mailing list
> [email protected]
> https://dev.eclipse.org/**mailman/listinfo/m2e-users<https://dev.eclipse.org/mailman/listinfo/m2e-users>
>
> ______________________________**_________________
> m2e-users mailing list
> [email protected]
> https://dev.eclipse.org/**mailman/listinfo/m2e-users<https://dev.eclipse.org/mailman/listinfo/m2e-users>
>
>
>
> _______________________________________________
> m2e-users mailing list
> [email protected]
> https://dev.eclipse.org/mailman/listinfo/m2e-users
>
>
>
> _______________________________________________
> m2e-users mailing list
> [email protected]
> https://dev.eclipse.org/mailman/listinfo/m2e-users
>
>
_______________________________________________
m2e-users mailing list
[email protected]
https://dev.eclipse.org/mailman/listinfo/m2e-users

Reply via email to