[ https://issues.apache.org/jira/browse/MAPREDUCE-4228?page=com.atlassian.jira.plugin.system.issuetabpanels:comment-tabpanel&focusedCommentId=13269962#comment-13269962 ]
Hadoop QA commented on MAPREDUCE-4228: -------------------------------------- -1 overall. Here are the results of testing the latest attachment http://issues.apache.org/jira/secure/attachment/12525912/MAPREDUCE-4228.patch against trunk revision . +1 @author. The patch does not contain any @author tags. +1 tests included. The patch appears to include 1 new or modified test files. -1 javadoc. The javadoc tool appears to have generated 2 warning messages. +1 javac. The applied patch does not increase the total number of javac compiler warnings. +1 eclipse:eclipse. The patch built with eclipse:eclipse. -1 findbugs. The patch appears to cause Findbugs (version 1.3.9) to fail. +1 release audit. The applied patch does not increase the total number of release audit warnings. +1 core tests. The patch passed unit tests in hadoop-mapreduce-project/hadoop-mapreduce-client/hadoop-mapreduce-client-app. +1 contrib tests. The patch passed contrib unit tests. Test results: https://builds.apache.org/job/PreCommit-MAPREDUCE-Build/2365//testReport/ Console output: https://builds.apache.org/job/PreCommit-MAPREDUCE-Build/2365//console This message is automatically generated. > mapreduce.job.reduce.slowstart.completedmaps is not working properly to delay > the scheduling of the reduce tasks > ---------------------------------------------------------------------------------------------------------------- > > Key: MAPREDUCE-4228 > URL: https://issues.apache.org/jira/browse/MAPREDUCE-4228 > Project: Hadoop Map/Reduce > Issue Type: Bug > Components: applicationmaster, mrv2 > Affects Versions: 0.23.1 > Reporter: Jason Lowe > Assignee: Jason Lowe > Attachments: MAPREDUCE-4228.patch, MAPREDUCE-4228.patch > > > If no more map tasks need to be scheduled but not all have completed, the > ApplicationMaster will start scheduling reducers even if the number of > completed maps has not met the mapreduce.job.reduce.slowstart.completedmaps > threshold. For example, if the property is set to 1.0 all maps should > complete before any reducers are scheduled. However the reducers are > scheduled as soon as the last map task is assigned to a container. For a job > with very long-running maps, a cluster with enough capacity to launch all map > tasks could cause reducers to launch prematurely and waste cluster resources. > Thanks to Phil Su for discovering this issue. -- This message is automatically generated by JIRA. If you think it was sent incorrectly, please contact your JIRA administrators: https://issues.apache.org/jira/secure/ContactAdministrators!default.jspa For more information on JIRA, see: http://www.atlassian.com/software/jira