[
https://issues.apache.org/jira/browse/MAPREDUCE-4711?page=com.atlassian.jira.plugin.system.issuetabpanels:comment-tabpanel&focusedCommentId=13837325#comment-13837325
]
Hadoop QA commented on MAPREDUCE-4711:
--------------------------------------
{color:red}-1 overall{color}. Here are the results of testing the latest
attachment
http://issues.apache.org/jira/secure/attachment/12548038/MAPREDUCE-4711.branch-0.23.patch
against trunk revision .
{color:red}-1 patch{color}. The patch command could not apply the patch.
Console output:
https://builds.apache.org/job/PreCommit-MAPREDUCE-Build/4237//console
This message is automatically generated.
> Append time elapsed since job-start-time for finished tasks
> -----------------------------------------------------------
>
> Key: MAPREDUCE-4711
> URL: https://issues.apache.org/jira/browse/MAPREDUCE-4711
> Project: Hadoop Map/Reduce
> Issue Type: Bug
> Components: jobhistoryserver
> Affects Versions: 0.23.3
> Reporter: Ravi Prakash
> Assignee: Ravi Prakash
> Attachments: MAPREDUCE-4711.branch-0.23.patch
>
>
> In 0.20.x/1.x, the analyze job link gave this information
> bq. The last Map task task_<sometask> finished at (relative to the Job launch
> time): 5/10 20:23:10 (1hrs, 27mins, 54sec)
> The time it took for the last task to finish needs to be calculated mentally
> in 0.23. I believe we should print it next to the finish time.
--
This message was sent by Atlassian JIRA
(v6.1#6144)