[ 
https://issues.apache.org/jira/browse/MAPREDUCE-5279?page=com.atlassian.jira.plugin.system.issuetabpanels:comment-tabpanel&focusedCommentId=14134287#comment-14134287
 ] 

Hadoop QA commented on MAPREDUCE-5279:
--------------------------------------

{color:red}-1 overall{color}.  Here are the results of testing the latest 
attachment 
  
http://issues.apache.org/jira/secure/attachment/12668819/apache-mapreduce-5279.3.patch
  against trunk revision 43b0303.

    {color:red}-1 patch{color}.  The patch command could not apply the patch.

Console output: 
https://builds.apache.org/job/PreCommit-MAPREDUCE-Build/4878//console

This message is automatically generated.

> Jobs can deadlock if headroom is limited by cpu instead of memory
> -----------------------------------------------------------------
>
>                 Key: MAPREDUCE-5279
>                 URL: https://issues.apache.org/jira/browse/MAPREDUCE-5279
>             Project: Hadoop Map/Reduce
>          Issue Type: Bug
>          Components: mrv2, scheduler
>    Affects Versions: 2.0.3-alpha
>            Reporter: Peng Zhang
>            Assignee: Peng Zhang
>            Priority: Critical
>         Attachments: MAPREDUCE-5279-v2.patch, MAPREDUCE-5279.patch, 
> apache-mapreduce-5279.3.patch
>
>
> YARN-2 imported cpu dimension scheduling, but MR RMContainerAllocator doesn't 
> take into account virtual cores while scheduling reduce tasks.
> This may cause more reduce tasks to be scheduled because memory is enough. 
> And on a small cluster, this will end with deadlock, all running containers 
> are reduce tasks but map phase is not finished. 



--
This message was sent by Atlassian JIRA
(v6.3.4#6332)

Reply via email to