[ 
https://issues.apache.org/jira/browse/MAPREDUCE-4711?page=com.atlassian.jira.plugin.system.issuetabpanels:comment-tabpanel&focusedCommentId=14524850#comment-14524850
 ] 

Hadoop QA commented on MAPREDUCE-4711:
--------------------------------------

\\
\\
| (x) *{color:red}-1 overall{color}* |
\\
\\
|| Vote || Subsystem || Runtime || Comment ||
| {color:red}-1{color} | patch |   0m  0s | The patch command could not apply 
the patch during dryrun. |
\\
\\
|| Subsystem || Report/Notes ||
| Patch URL | 
http://issues.apache.org/jira/secure/attachment/12548038/MAPREDUCE-4711.branch-0.23.patch
 |
| Optional Tests | javadoc javac unit findbugs checkstyle |
| git revision | trunk / f1a152c |
| Console output | 
https://builds.apache.org/job/PreCommit-MAPREDUCE-Build/5553/console |


This message was automatically generated.

> Append time elapsed since job-start-time for finished tasks
> -----------------------------------------------------------
>
>                 Key: MAPREDUCE-4711
>                 URL: https://issues.apache.org/jira/browse/MAPREDUCE-4711
>             Project: Hadoop Map/Reduce
>          Issue Type: Bug
>          Components: jobhistoryserver
>    Affects Versions: 0.23.3
>            Reporter: Ravi Prakash
>         Attachments: MAPREDUCE-4711.branch-0.23.patch
>
>
> In 0.20.x/1.x, the analyze job link gave this information
> bq. The last Map task task_<sometask> finished at (relative to the Job launch 
> time): 5/10 20:23:10 (1hrs, 27mins, 54sec)
> The time it took for the last task to finish needs to be calculated mentally 
> in 0.23. I believe we should print it next to the finish time.



--
This message was sent by Atlassian JIRA
(v6.3.4#6332)

Reply via email to