http://000417b6df56f4ae5bbf-f6bd2cfeac0f4625637eac684e9e6a05.r25.cf1.rackcdn.com/12/ac0b2360e2eda3ef94a11f118a4f3c8f.pdf?id=224933

Dec 2013 RFP

must be installed by June 2013 - maybe they mean June 2014

Greater Boston area

no specific locations given - should be 6 locations

-- 
You received this message because you are subscribed to the Google Groups 
"massfire" group.
To unsubscribe from this group and stop receiving emails from it, send an email 
to [email protected].
To post to this group, send email to [email protected].
Visit this group at http://groups.google.com/group/massfire.
For more options, visit https://groups.google.com/d/optout.

Reply via email to