http://www.caltrain.com/Assets/_Rail_Safety/doc/Caltrain+RWP+Study+Guide.pdf

17 pages

heavy equipment has to stay 45 feet away from any power lines of
unknown voltage - can get within 10 feet of 50 kV lines

I still dont know the definition of main track 1 and 2 - I would gues
that main track 1 is the primary line heading north or east - ???

-- 
You received this message because you are subscribed to the Google Groups 
"massfire" group.
To unsubscribe from this group and stop receiving emails from it, send an email 
to [email protected].
To post to this group, send email to [email protected].
Visit this group at https://groups.google.com/group/massfire.
For more options, visit https://groups.google.com/d/optout.

Reply via email to