Hi

Well I am not having trouble specifying the loads as dispatchable. However
 as can you see from the System Summary just 1025.5 of 2296.2 [MW], which
is the total load is dispatchable, so a few loads are dispatched at values
less than their nominal value.

I hope this could clarify my question.

Thanks
Carlos


================================================================================
|     System Summary
    |
================================================================================

How many?                How much?              P (MW)            Q (MVAr)
---------------------    -------------------  -------------
 -----------------
Buses             24     Total Gen Capacity    5107.5        -535.0 to
2664.0
Generators        33     On-line Capacity      5107.5        -535.0 to
2664.0
Committed Gens    33     Generation (actual)   1036.0            -124.1
Loads             17     Load                  1025.5             208.5
  Fixed            0       Fixed                  0.0               0.0
  Dispatchable    17       Dispatchable        1025.5 of 2296.2   208.5
Shunts             1     Shunt (inj)             -0.0            -108.4
Branches          38     Losses (I^2 * Z)        10.53             96.82
Transformers       5     Branch Charging (inj)     -              537.7
Inter-ties        10     Total Inter-tie Flow   602.1             267.0
Areas              4

2015-05-06 15:54 GMT+01:00 Ray Zimmerman <[email protected]>:

> We will need more information. What do you mean by “one part of the load
> becomes dispatchable”? Are you saying that you are having trouble
> specifying your loads as dispatchable or that only a few loads are
> dispatched at values less than their nominal value? Or that the loads that
> are curtailed are only partially curtailed?
>
> We need to know what specifically you expected to see and how your result
> differs from that.
>
>    Ray
>
>
> > On May 6, 2015, at 10:11 AM, Carlos Cruzat Hermosilla <
> [email protected]> wrote:
> >
> > Hi All
> >
> > I am currently working with dispatchable loads in order to see the
> impact of overloading the lines of the network. However when I run OPF just
> one part of the total load becomes dispatchable which obviously affects my
> results, so Does anybody knows what could be the reason?
> >
> > Thanks,
> > Carlos
> >
> > PD: The generation and lines capacities are enough to provide the
> required energy.
>
>
>
>

Reply via email to