1. Yes. 2. CPF with generator active and reactive power limits should be hopefully available in the upcoming version of MATPOWER. Checking for min. or max. bus voltages is not available in CPF. With some modifications in the CPF code, you should be able to check voltages. We were working on user-defined callbacks for CPF to enforce limits, check voltages, or any other user-defined operation. But, we decided to not add in the MatPower code base for now. Hopefully, we can have that feature available in the future.
Shri On Jun 9, 2016, at 8:15 AM, Thomas Jäckel <jaeckel.tho...@gmx.net<mailto:jaeckel.tho...@gmx.net>> wrote: Hallo, I have a two questions concerning the functionality of the runcpf-function. 1. If I get it correctly, it can be used the following way: You have to import a basescenario and a targetscenario. Then the tool calculates the difference (Sxfr) between the base-power and target-power at every bus. Based on these datas the actual cpf starts and determines the maximum value for lambda, whereby the maximum transmitted power equals lambda*Sxfr. Is this correct? 2. Is there any way to limit the maximum or minimum voltage per bus or to limit the reactive power generation per generator? Thank you very much Thomas