I’m afraid not. The DC OPF formulates an LP/QP problem (depending on the 
generator costs) and passes this to a generic LP/QP solver. So the non-linear 
user constraints only apply to the AC OPF.

    Ray


> On Jan 3, 2019, at 10:09 AM, Sergio Garcia Marin <[email protected]> 
> wrote:
> 
> Hello all,
> 
> I was wondering if is it possible to run the dc opf with non linear user 
> constraints? And in that case, what would it be the best solver to use?
> 
> Thanks a lot.
>  <http://www.gipem.co/>