I’m afraid not. The DC OPF formulates an LP/QP problem (depending on the generator costs) and passes this to a generic LP/QP solver. So the non-linear user constraints only apply to the AC OPF.
Ray
> On Jan 3, 2019, at 10:09 AM, Sergio Garcia Marin <[email protected]>
> wrote:
>
> Hello all,
>
> I was wondering if is it possible to run the dc opf with non linear user
> constraints? And in that case, what would it be the best solver to use?
>
> Thanks a lot.
> <http://www.gipem.co/>
